Bid capacity
The same team prices more work in the peak window.
AI take-off for linear infrastructure
Nobody traces. Everyone can check.
Overhead lines, access routes and cable routes, measured and annotated for your estimator to check and sign.
Book a demoOverhead lines, access routes, cable routes. Each is traced by hand against the legend, sheet by sheet, and traced again whenever the drawing is revised.
The cost of the tracing is visible. The cost of the disagreement is not.
The drawing arrives as issued.A PDF from the design team. Nothing is redrawn or cleaned up first.
Your estimator picks the assets from the legend.Two are selected here. Untick one and the total follows.
Each asset is measured along its full length.The figures below are read from this drawing, at its stated scale of 1:12 500.
Every metre is annotated back to its source line.The check is a look at the drawing, not a second take-off.
Checked, signed, then exported to Excel.Nothing leaves until your estimator has reviewed it.
Sample scheme, redrawn for illustration. The quantities are the trial's measured results: proposed overhead line 6,522 m, existing access 5,261 m.
Same team. Same drawings. The estimator signs.
The same team prices more work in the peak window.
Quantities re-run at each revision, not once per stage.
Two estimators, one drawing, one answer.
A record of how every figure was derived, where none existed.
New estimators work to the team's standard from day one.
The tracing goes to the tool. The judgement stays with the estimator.
In the trial, a take-off that had taken weeks by hand ran in under 15 minutes. That time goes into coverage: more bids priced and every revision measured, by the same team.
In a trial with a Tier 1 consultancy on a 400 kV overhead line scheme, the team's own manual take-off was withheld until the run was done. Then the two were compared.
The method makes the number falsifiable.
| Asset | InstaTrace | Manual, withheld | Difference |
|---|---|---|---|
| Proposed overhead line | 6,522 m | 6,519 m | +0.05% |
| Existing access, good/fair | 5,261 m | 5,315 m | −1.0% |
TechFest Awards 2026
Best Use of Technology: Artificial Intelligence
InstaTrace is shortlisted at the TechFest Awards, run by Construction News and New Civil Engineer. Winners are announced on 25 November 2026. See the 2026 shortlist.
Bring a representative drawing.We would show you what a checked, traceable take-off could look like for your team.
Book a demo